Aerial view of Ebbsfleet Garden City © Ebbsfleet Development Corporation

The Ebbsfleet Development Corporation (EDC) was established in April 2015 to drive the delivery of a 21st Century Garden City in Ebbsfleet, North Kent.
The Garden City spans an area of over 1000 hectares, within which the Corporation are championing several large-scale developments, including significant investment in infrastructure, utilities, highways, transportation, commercial space, housing, along with green and blue leisure space. It builds on the ethos and pioneering spirt of the original Garden Cities and New Towns, aiming to create a place founded on quality place-making, community building and sustainability, making long-term arrangements for the care of public spaces and assets.
The forum will play an important role in furthering EDC’s commitment to delivering characterful and distinctive places that are informed by the local area’s remarkable surroundings.
The Ebbsfleet Design Forum is chaired by Professor Sadie Morgan, Founding Director of architecture practice dRMM. Chloë Phelps, Director at Grounded and BTPW, is the forum's vice chair.
Ashmere, PRP Architects © Andrew Hendy
Meeting dates
One Design Forum meeting date is provisionally arranged for each month.
Exceptionally, additional meetings may be required to accommodate the number of schemes requiring a review and/or to meet key dates for specific schemes.
The following dates are currently set for Ebbsfleet Design Forum meetings during 2025:
-
16 January
-
20 February
-
20 March
-
17 April
-
15 May
-
19 June
-
17 July
-
21 August
-
18 September
-
16 October
-
20 November
-
11 December

Ebbsfleet Green Primary School © Ebbsfleet Development Corporation

Meeting fees
The charges for Ebbsfleet Design Forum meetings are benchmarked against comparable panels providing design review services in Brighton & Hove in Sussex, and Folkestone & Hythe in Kent.
Current charges for Ebbsfleet Design Forum meetings are:
• Full review £4,825 + VAT
• Chair’s review £3,250 + VAT
The cost of venue hire, if required, would be in addition to the charges above.
Where a scheduled review is subsequently cancelled or postponed by the applicant, an administrative charge will be applied:
• 50% of full cost: less than two weeks before
scheduled review
• £800 + VAT: between two and four weeks
before scheduled review