Grade II listed Fullwell Cross Library in Barkingside, Frederick Gibberd, part of the
Barkingside Town Centre project, DK-CM for the London Borough of Redbridge

Redbridge Welcome Centre, Peter Barber Architects © Morley von Sternberg 

Redbridge has a rich architectural character, with 16 conservation areas and some 400 statutory or locally listed buildings. It is also one of the greenest parts of London, with approximately 45 per cent of the borough classified as parks and open spaces.

 

Opportunities for growth across the borough are great – not least the Elizabeth line corridor, which is seeing significant developer interest. However, Redbridge also faces challenges such as disconnect from nature and car-dominated environments.

 

It is essential that development integrates successfully into what already makes Redbridge distinctive, and creates exceptional places where communities thrive and enjoy a good quality of life. In addition to adopting strategies and policies to promote growth, the Council established a Design Review Panel in 2019. The panel continues to support both officers and members in achieving high-quality development.

 

The Redbridge Design Review Panel is chaired jointly by Teresa Borsuk, Senior Advisor at Pollard Thomas Edwards, and Richard Lavington, Director at Maccreanor Lavington.

Redbridge Welcome Centre, Peter Barber Architects © Morley von Sternberg 

Meeting dates

One Design Review Panel meeting date is provisionally arranged for each month.

 

Exceptionally, additional meetings may be required to accommodate the number of schemes requiring a review and/or to meet key dates for specific schemes.

 

The following dates are currently set for Redbridge Design Review Panel meetings during 2025:

  •  21 January

  •  18 February

  •  18 March

  •  15 April

  •  20 May

  •  17 June

  •  15 July

  •  19 August

  •  16 September

  •  21 October

  •  18 November

  •  16 December​​​​

Box Theatre and Performing Arts Centre, Ayre Chamberlain Gaunt Architects © Andy Matthewsd performing arts centre-A

Box Theatre and Performing Arts Centre, Ayre Chamberlain Gaunt Architects © Andy Matthews

Chapel Square, Ilford, Hutchinson & Partners

Meeting fees

The charges for Redbridge Design Review Panel meetings are benchmarked against comparable panels providing design review services in London, such as design review panels in the London Boroughs of Camden, Haringey, Newham and Waltham Forest, and the Old Oak and Park Royal Development Corporation.

 

Current charges for Redbridge Design Review Panel meetings are:

 

•  Full review                      £5,985 + VAT
 

•  Intermediate review      £4,375 + VAT

•  Chair’s review                £3,300 + VAT

The cost of venue hire, if required, would be in addition to the charges above.

Where a scheduled review is subsequently cancelled or postponed by the applicant, an administrative charge will be applied:

 

•  50% of full cost: less than two weeks before
   scheduled review

•  £800 + VAT: between two and four weeks

   before scheduled review

Chapel Square, Ilford, Hutchinson & Partners